Work that speaks for itself

Photos of installations carried out by Bakker Energie Techniek.

Victron ESS with battery rack

Gouda · August 2026

Victron ESS with battery rack

Three MultiPlus-II inverters on a cleanly finished mounting panel, with Pylontech batteries in an enclosed rack. Everything clear and reachable for maintenance.

Cabling and distribution

Gouda · August 2026

Cabling and distribution

The DC distribution and fuses during assembly. Every cable cut to length, labelled and neatly routed.

Connecting the batteries

Gouda · August 2026

Connecting the batteries

Connecting the battery modules. This is the moment the installation is energised for the first time.

Inverter in an existing space

Bergambacht · May 2026

Inverter in an existing space

Not every home has a modern utility room. Even in an old back kitchen it can become a tidy installation.

EV charger on site

EV charger on site

A Peblar charger before it goes on the wall. Which model suits your energy connection differs per situation.

Peblar charger on the facade

Schoonhoven · August 2026

Peblar charger on the facade

Charger on the side wall, with the supply cable run neatly downward in a black conduit. Weatherproof mounting, ready to use straight away.

Peblar with MID meter

Schoonhoven · August 2026

Peblar with MID meter

Charger with a built-in MID-certified meter, so charging consumption is measured separately and accurately. Useful for business driving, claiming charging costs and applying for ERE certificates.

Fuse box upgraded for the charger

Schoonhoven · August 2026

Fuse box upgraded for the charger

Dedicated circuit with its own RCD for the charge point and a MID kWh meter in the existing fuse box. All circuits labelled and neatly connected.

Outdoor installation

Bergambacht · May 2026

Outdoor installation

Connection work on an exterior wall. Weatherproof mounting, finished in accordance with applicable standards.

In person

In person

From advice to handover you have one point of contact.

Fuse box renewed for an EV charger and heat pump — BeforeBefore
Fuse box renewed for an EV charger and heat pump — AfterAfter

Schoonhoven · August 2026

Fuse box renewed for an EV charger and heat pump

The old consumer unit had no room for a charge point. The fuse box was replaced with a Hafonorm installation: separated RCDs, a dedicated group for the charge point and two groups for the heat pump. Every group is labelled.