Home/EV Charger/Charging point installation

Charging point installation:
everything you need to know

From checking your meter cupboard to the moment your car charges for the first time: here you can read what installing a charging point at home involves.

Charging your electric car from an ordinary socket? Better not.

Charging an electric car at home looks simple. You already have an outdoor socket and the car comes with a charging cable. So why invest in a charging point? Even so, an ordinary socket is not the ideal way to charge your car on a regular basis.

While charging, your car draws a lot of power for a long time. A standard socket is not always designed for that. If other appliances are on at the same time, such as the oven, kettle or washing machine, the installation is put under heavy load. As a result, a fuse or residual current device can trip and leave you without power.

Charging speed matters too. The battery of an average electric car has a capacity of about 60 kWh. Through a normal socket you usually charge at about 2.3 kW. Charging a full battery can therefore easily take 16 hours or more, and the socket is under heavy load the whole time.

But there is a more important concern

Prolonged heavy load on an unsuitable socket, a poor connection or a damaged cable can cause overheating. In the worst case this can lead to a fire. Electrical problems can be a significant cause of house fires, so this is a risk you would rather avoid. A professional charging point is designed specifically to supply an electric car with power safely over long periods, and it also charges faster and more reliably.

A charging point is therefore not just an investment in convenience, but above all in safe electric driving.

Connecting the charging point in the meter cupboard

A good charging point installation starts at the meter cupboard. Before we install a charging point, we check whether your existing electrical installation is suitable for charging an electric car. Among other things, we look at the available capacity, the main fuse, the distribution board and how the charging point can be connected.

With a charging point at home, it is important that the installation is carried out safely and reliably. Depending on the situation, we install a new circuit and sometimes the meter cupboard needs to be adapted. As an experienced charging point installer, we assess in advance what is needed, so you are not faced with unexpected work.

Single-phase or 3-phase charging point: what do you need?

Not every electric car and not every home needs a 3-phase charging point. A charging point can be installed on a single-phase or a 3-phase connection. Which solution fits depends on, among other things, the car, the connection of the home and how fast you want to be able to charge.

With a single-phase connection you can charge your electric car at home perfectly well. A 3-phase connection allows a higher charging power, so the car is usually full sooner.

A 3-phase charging point is therefore not automatically necessary. During preparation, we look at which charging solution best fits your car and your connection. That way you do not have more installed than you actually need.

Load balancing: what is it and do you need it?

Load balancing automatically adjusts the power of the charging point to the other electricity use in the home or business. If, for example, the washing machine, oven and heat pump are running at the same time, the charging point temporarily uses less power.

When capacity becomes available again, the charging point raises the charging power automatically. This makes the best possible use of the available capacity and prevents the maximum capacity of your connection from being exceeded.

When installing the charging point, we assess whether load balancing is worthwhile for your situation. It is especially useful in homes with several large power consumers or a 3-phase connection.

View the Load Balancing package

Dynamic charging with a charging point

With dynamic charging, the charging power is matched to the available capacity or to the moment when charging is favourable. Depending on the charging point, the car and your energy supplier, you can for example charge when the electricity price is lower.

Dynamic charging can also be combined with solar panels. When plenty of solar power is available, a suitable charging point can use that energy to charge your car.

Which options are available depends on the charging point, the car and the electrical installation. That is why we discuss in advance which features are relevant to you.

Installing multiple charging points

If there are several electric cars, it can be worthwhile to install multiple charging points. For example at a business, an apartment complex, a car park or a home with more than one electric car.

With multiple charging points, it is important to look carefully at the available electrical capacity, so the charging points are connected safely and efficiently. As a charging point installer, we can prepare the installation for multiple charging points. With smart charging technology and load balancing, the available power is shared across the charging points.

Checking the meter cupboard

Before we install the charging point, we check the meter cupboard. Among other things, we look at the available capacity, the existing circuits and the options for connecting the charging point safely.

Based on that, we determine what work is needed. Sometimes the charging point can be connected straight away; in other situations an extra circuit, an adjustment or an extension of the meter cupboard is needed. A good check in advance ensures you can use your charging point at home safely and reliably.

Laying the cable and connection

The charging point has to be connected to the meter cupboard in the right way. We determine in advance which cable is needed and which route is most suitable.

We then lay the cable neatly and safely, depending on the situation for example through the home, the garage or the outdoor area. Correct cabling is an important part of a professional charging point installation. We make sure the connection is suitable for the required charging power and that the installation is finished neatly.

Configuring the charging point

After mounting and connecting, we configure the charging point. Depending on the type, we can set things such as the maximum charging power, load balancing, user management and smart charging features.

If the charging point has an app or an online connection, we also check that it is linked and set up correctly. That way we make sure the charging point is ready to use straight after installation.

Testing and handing over the charging point

Installing a charging point does not stop at mounting and connecting it. After installation, we check and test the complete installation: the connection, the protection devices and the operation of the charging point. We also test whether the car actually charges and whether features such as load balancing work properly.

Only when everything works as it should do we hand over the charging point installation. You get an explanation of how to use it, so you can charge your electric car safely and comfortably right away.

Money back for charging your car

Charging your car costs electricity, but you may also be able to get money back for it. Under the ERE scheme (Emission Reduction Units), electric drivers are rewarded for the CO₂ emissions they save. For every kWh you charge at home with a suitable charging point, ERE certificates can be built up. These have a monetary value and can be sold.

To take part, your charging point needs a built-in MID-certified meter that records exactly how much electricity your car charges at home. Not every charging point has such a meter, so keep this in mind when buying one.

Read more about ERE certificates

Running a charging cable across the pavement: what are the rules?

Want to charge your electric car in front of your house, but have no driveway of your own? Then it is tempting to run the charging cable across the pavement to your car. But is that actually allowed? The short answer: in most Dutch municipalities it is prohibited. There are, however, more and more exceptions.

Below we explain the general rules, the risks you run and why it is important to check the rules in your own municipality.

Municipalities are responsible for the safety and accessibility of public roads. A loose cable on the pavement is a tripping hazard, especially for people with poor eyesight, older people and people with a pram, wheelchair or walker. If you run a charging cable across the pavement without permission, you are usually breaching the local by-laws (APV). You can be fined for this, and if someone trips over your cable and is injured, you can be held liable.

Policy is changing, though. More and more municipalities are experimenting with solutions to encourage electric driving and allow 'pavement charging' under strict conditions. If your municipality allows it, these requirements often apply:

  • Own charging point: the charging point is on your own property, for example in the front garden.
  • Directly adjacent: the public parking space is directly next to the pavement in front of your house.
  • Safety measures: you use an approved, non-slip cable mat, or the municipality installs a cable channel tile (a paving tile with a slot).
  • Tidy up straight away: the cable is only outside while the car is charging and is removed immediately afterwards.
  • No private parking space: the public parking space stays public. You do not get exclusive rights to it.

Because policy varies greatly between municipalities, there is one fixed rule: always check the rules of your own municipality before running a charging cable across the pavement. What one municipality tolerates with a cable mat can lead to a fine in the next village.

Do you live in the municipality of Krimpenerwaard?

The municipality of Krimpenerwaard currently has no rules on charging with a cable across the pavement. It is therefore not explicitly permitted, but not prohibited either. One rule does apply: a cable across a public road must not obstruct other road users. If it does, the municipality can take enforcement action under article 2:15 of the local by-laws (APV).

The municipality currently advises against this way of charging. Charging with a cable across the pavement is at your own risk, and it may still be prohibited in the future. A charging point you had installed for this purpose could then no longer be used in that way.

The municipality is working on more clarity: pavement charging may be allowed under conditions, or it may not. The municipality will share news on this via krimpenerwaard.nl and Het Kontakt. The public charging network will also be expanded further over the coming years. Considering a charging point with a cable across the pavement? Get in touch and we will look together at what makes sense in your situation.

Based on an enquiry with the municipality of Krimpenerwaard in April 2026. At the last check, in October 2026, the municipality had not yet published a new decision.

Having a charging point installed?

Request a no-obligation quote or view the charging point packages. You get personal advice on what suits your car and home.

Call +31 6 19683900